K
Kumty
INTELLIGENCE

Where your team really loses time.

Quantify idle, blocked, overdue, orphaned, rework, and stale work as a single index. See the leak before it becomes a write-off.

Without this

Here's what delivery feels like today.

  • Waste is invisible until retrospective

    Work that sat idle. Tasks that blocked other tasks. Rework nobody tracked. It all shows up at the end — as a mystery.

  • Nobody measures it in dollars

    'We're losing time' is a vague claim. 'We're losing $340K/year to blocked work' is a decision-grade number. Most tools give you the first.

  • Rework and stale work keep repeating

    Without visibility, the same patterns come back every quarter. Same blocked dependencies, same orphaned tasks, same half-done initiatives.

With Kumty

Here's what changes.

  • Six waste categories, one index

    Idle, Blocked, Overdue, Orphaned, Rework, and Stale — each measured, each scored, combined into a single Execution Waste Index you can track over time.

  • Dollar cost per category

    Blended hourly rates × wasted hours = dollars. You can take this number to the board. It's auditable and it's real.

  • Trend analysis with radar visualization

    See waste by category on a radar chart. Watch the shape change over time. Know whether your interventions are actually working.

How It Works

Six categories. Six leaks. One index.

  1. 1

    Detect waste across six categories

    Idle (work assigned but not progressing), Blocked (waiting on a dependency), Overdue (past deadline), Orphaned (no owner), Rework (reopened tasks), Stale (untouched for too long).

  2. 2

    Score each category in hours and dollars

    Blended hourly rate × affected hours = dollar cost per category. Weighted composite into the Execution Waste Index.

  3. 3

    Visualize on a radar chart

    Six axes, one shape. The shape tells you the failure mode — blocked-heavy, rework-heavy, stale-heavy. Each has a different intervention.

  4. 4

    Track the trend

    Snapshots stored per project and per portfolio. Week-over-week comparison. The radar shape should shrink as you intervene — and you can prove it.

Proof of Intelligence

Six waste categories measured in hours and dollars. Radar visualization with trend. Snapshots per project and per portfolio. Tenant-configurable blended hourly rates.

What It Feels Like

The day-to-day difference.

Before

We're wasting time. A lot of it. I can feel it. I just can't prove it to finance.

After

$340K/year in waste. 47% blocked, 22% rework, 18% idle. Here's the radar. Here's the trend. Here's where we intervene.

Built to Measure

The numbers behind the feature.

6

waste categories

idle / blocked / overdue / orphaned / rework / stale

$

dollar cost per category

auditable and defensible

Trended

over time

radar visualization + snapshots

See waste in dollars.

Fifteen minutes. Full Professional trial. No credit card.